Grenfell Inquiry: new details of tragic refurb emerge

Grenfell

Tower’s ‘purely decorative’ architectural crown aided spread of fire, report says

The first-phase report from Martin Moore-Bick’s Grenfell Tower Inquiry has revealed new details of the refurbishment failings that preceded 2017’s fire, which cost 72 people their lives.

They include the creation of a new architectural crown featuring aluminium composite material (ACM) cladding at the top of the 25-storey building and its replacement windows.

Elsewhere, retired judge Moore-Bick’s report sidesteps two key safety features demanded by RIBA – retrofitting fire-suppression systems, such as sprinklers, in buildings taller than 18m and the inclusion of secondary staircases to multiple-occupancy blocks taller than three storeys.

This content is available to registered users | Already registered?Login here

You are not currently logged in.

To continue reading this story, sign up for free guest access

Existing Subscriber? LOGIN

REGISTER for free access on selected stories and sign up for email alerts. You get:

  • Up to the minute architecture news from around the UK
  • Breaking, daily and weekly e-newsletters

 

Subscribe to Building Design and you will benefit from:

Gated access promo

  • Unlimited news
  • Reviews of the latest buildings from all corners of the world
  • Technical studies
  • Full access to all our online archives
  • PLUS you will receive a digital copy of WA100 worth over £45

Subscribe now for unlimited access.